Machine Utilization Strategy

Machine Utilization Strategy (MUS)

Tool change and setup/gaging can significantly decrease Listed below are the products and services WIDIA

production time. WIDIA recommends the implementation of recommends to provide the most time and cost savings, a Machine Utilization Strategy (MUS). This system incorporates which are principle to the MUS.

the products, technologies, and procedures that generate the

maximum utility from capital equipment.

1. KM Quick Change Tooling Reduces downtime and increases productivity by cutting the time spent on tool change and setup.

2. Advanced Cutting Tool Materials Increase production through the utilization of the most advanced cutting tools that enable machines to run longer and faster between tool changes.

3. Tool Kitting Provides all the tooling (fixturing included) required to complete a production run or shift operation.

4. Pregaged Tooling Eliminates measuring cuts from the setup process, reduces the risk of human error at the machine control, and provides a quick and efficient method for changing worn tools.

This manufacturing strategy hastens every aspect

of the production process from the machine to the

tool room. It will improve tool maintenance, increase

machining time and productivity, and decrease

non-conforming percentages.

5. Advanced Tool Management Systems Specifically designed to facilitate the effective management of cutting tools but are equally capable of controlling other types of inventory and consumable goods.